Plaster & flooring arrive
/Construction has been flying by! At this stage of the project, the sheetrock has been hung and plastered. All rough plumbing, electrical and structural engineering has been completed and the flooring was woven in, stained and polyurethaned.
Next up: cabinets and finish work!